Location
Berlin, Germany
Owner
Deutsche Bahn AG
Completed on
2004
Scope of our work
conceptual design, construction design, site supervision
Architect
von Gerkan Marg und Partner, Berlin
The air ventilation of a parking garage and a large road tunnel underneath the Lehrter Bahnhof will be provided by a 60 m high vent stack with a discharge cross section of 30 m². The freestanding steel structure is built by three vertical shear walls rotated 60° to each other. Every shear wall is stiffened by steel frames and crosswise installed tension rods. The space between the frames is filled with translucent glass blocks. Foto: Müller Offenburg
Height: 60 m
Base area: approx. 30 m²
Height: 60 m
Base area: approx. 30 m²
Berlin Main Train Station: vent stack
