Scope of our work
conceptual design, construction design, site supervision
Architect
schlaich bergermann und partner;
Silcher, Werner und Partner, Hamburg
The design of the 70 × 120 m wide and long membrane roof was determined by low costs (» 650,- DM/m²) and short erection time (7 months including foundation work). The primary structure consists of a prestressed membrane that is supported by piles and cables. Dependant on the stress, the cutting pattern of the membrane was aligned in radial and tangential stripes. Due to high translucency of the textile membrane the load paths are visible from underneath.
Membrane Surface: 7,000 m²
Free spans of membrane: 20 m
Axe Length: 70 × 120 m
Elevation: 20 m
Membrane Type: IV
Membrane Surface: 7,000 m²
Free spans of membrane: 20 m
Axe Length: 70 × 120 m
Elevation: 20 m
Membrane Type: IV