Location
Oldenburg, Germany
Owner
Stadt Oldenburg
Completed on
1995
Scope of our work
conceptual design, constuction design, site supervision, erection analysis
Architect
schlaich bergermann und partner; Kulla, Herr und Partner, Oldenburg
The roof is formed by 14 rectangular elements, supported by steel masts. The membrane spans to the lowest point, ensuring the required curvature necessary for pre-stressing. At the outer edges of the roof, inclined masts take the horizontal force necessary for the pre-stressing.
Area: 3,500 m²
Area: 3,500 m²
Roof Marschweg Stadium Oldenburg


