Location
Ingolstadt, Germany
Owner
Stadt Ingolstadt
Completed on
1998
Scope of our work
general contractor, conceptual design, construction design, site supervision
Architect
schlaich bergermann und partner;
Ackermann und Partner, München;
Peter Kluska, Landschaftsarchitekten, München
The design of this 164 m long Danube Bridge is characterized by a cable supported slender concrete deck with the walkways following the alignment of the cables. This structure combines a concrete frame with inclined struts and a stress ribbon. The foot paths are separated from the deck and rest on smaller cables arranged on either side of the main cables whilst the automobile traffic uses the upper level.
Length: 164 m
Main span: 105 m
Total length: 185 m
Total width: 19.65 m (3,5 – 2,25 – 3,5 m)
Cables: Ø 118 / 106 mm – 180 t
Concrete: 5,200 m³
Structural steel (St 52-3): 230 t
Reinforcement steel: 1,000 t
Steel for pre-stressed concrete: 16 t
Length: 164 m
Main span: 105 m
Total length: 185 m
Total width: 19.65 m (3,5 – 2,25 – 3,5 m)
Cables: Ø 118 / 106 mm – 180 t
Concrete: 5,200 m³
Structural steel (St 52-3): 230 t
Reinforcement steel: 1,000 t
Steel for pre-stressed concrete: 16 t
Glacis Bridge Ingolstadt