Location
Ulm, Germany
Owner
Stadt Ulm
Completed on
1993
Scope of our work
conceptual design, construction design
Architect
Jauss + Gaupp + Partner, Friedrichshafen
The entrance area of the train station forecourt in Ulm is covered by a transparent glass suspension roof. The glass roof covering hangs freely across a span width of 23 m and is fixed by steel stress ribbons (25 × 60 mm). The 24 m long horizontal edge girders also contribute to the elegant appearance of the roof through their wing-like aluminum cladding. Within this area the resulting horizontal forces from the steel stress ribbons are collected and are transferred into the foundation via 4 bearing brackets.
Length: 24.1 m
Width: 24.6 m
Span: 23.4 m
Height of arch rise: 1.2 m
Height above ground: max. 5.7 m / min. 4.5 m
Glass area: 570 m²
Glass panels: dimensions 98 cm x 200 cm
: thickness 8 mm + 6 mm (top) = 14 mm
Structural steel: 51 t
Length: 24.1 m
Width: 24.6 m
Span: 23.4 m
Height of arch rise: 1.2 m
Height above ground: max. 5.7 m / min. 4.5 m
Glass area: 570 m²
Glass panels: dimensions 98 cm x 200 cm
: thickness 8 mm + 6 mm (top) = 14 mm
Structural steel: 51 t
Railway Station Entrance Canopy