Location
Hanover, Germany
Owner
EXPO 2000 Hannover GmbH; Deutsche Messe AG, Hannover
Completed on
2000
Scope of our work
competition, construction design
Architect
gmp · Architekten von Gerkan, Marg und Partner
It was the idea of the architect to provide these initially six bridges with different lengths and widths, out of which later four were built, with a homogeneous image. His scenery of light masts was transformed by the engineers into a logical structural concept applying the principle of cable-stayed bridges – a successful symbiosis of architectural and engineering principles. All bridges are based on a raster of 7.5 × 7.5 m and are built of equal elements.
Longest bridge: 18 × 7.5 m = 135 m
Widest bridge: 6 × 7.5 m = 45 m
Largest span: 6 × 7.5 m = 45 m
Steel: St 52-3
Tensile rods: Macalloy 460
Cast steel: GS 20 MN 5 V
Deck slab, permanent: concrete B25
Deck slab, temporary: larch, profiled
Longest bridge: 18 × 7.5 m = 135 m
Widest bridge: 6 × 7.5 m = 45 m
Largest span: 6 × 7.5 m = 45 m
Steel: St 52-3
Tensile rods: Macalloy 460
Cast steel: GS 20 MN 5 V
Deck slab, permanent: concrete B25
Deck slab, temporary: larch, profiled
Pedestrian Bridges EXPO 2000