© swen carlin 2011

Within two years the Mercedes-Benz Arena was retrofitted into a soccer stadium with an integrated gymnasium. The unsupported gymnasium was overbuilt with two upper levels of the stand and integrated in the Untertürkheimer-curve. 2,35 m high pre-stressed concrete trusses reach a length of 38 m. Inside, the pre-stressed concrete trusses are mounted indirectly at a cross girder. In this way the support reactions are spread in crosswise direction along the transversal stanchions which are off the axis of the pre-stressed concrete trusses. At the outside the support is situated on the curved reinforced concrete external wall.

Categories
Arena, Stadia & Arenas
Location
Stuttgart, Germany
Architect
asp architekten Stuttgart
Owner
Stadion Neckarpark GmbH & Co.KG
Project Responsibility
Knut Göppert

Insights

Technical Data

GFA (level 0 and 1)
10,380 m²
Length x width
76 m x 38 m
Height
11,5m
Gross cubic capacity
67,480 m³
Seats
2,000