Media

Beton- und Stahlbetonbau News

Beton- und Stahlbetonbau News
sbp 01.11.2018

Due to its restricted structural clearance, the existing arch bridge “Rotes Steigle” was replaced by a distinctive new structure, which provides a crossing for a forest road over the highway. The load bearing structure of the integral composite bridge comprises a lower arched steel box girder with varying cross-section dimensions, steel struts that are angled outwards and a reinforced concrete deck slab.
The news provide a brief overview of the construction process.

 

Link:Article Link:Project

Schwabstraße 43
70197 Stuttgart

+49 711 64871-0
info@sbp.de