October 22, 2024

Construction site update from the Terminal 2 at Nice Airport

The construction work on the extension of Terminal 2 at Nice Airport is ongoing. A large part of the steel framework forming the structure of the top level as well as the support for cladding and roofing have already been installed.

Share
Contact

This includes an impressive Bridge building, spanning approximately 50 meters, which will provide access to the extension of the Terminal 2, while allowing the movement of vehicles necessary for the airport’s operations underneath. The facade work has begun, covering a length of about 200 meters, which represents a significant challenge, and we look forward to seeing the result.