• INDITEP Pilot Plant PSA Direct Steam Production
Projects

INDITEP Pilot Plant PSA Direct Steam Production

Almería, Spain, 2003

Two drive units, each used to actuate eight linked collectors with a total length of 100 m, were designed for the Spanish Research Centre for Energy, Environment and Technology (CIEMAT) as slightly modified successors of the EuroTrough II parabolic trough collector. The collectors are used to preheat water for an existing experimental parabolic trough. In contrast to previous parabolic troughs, the INDITEP is designed to be erected on sloped ground surfaces. This building site has a slope of 1.5°.


  • Location

    Almería, Spain

  • Client

    C.I.E.M.A.T., Madrid

  • Our Scope of Work

    conceptual design, detailed design

  • Loop length 600 m
  • Aperture 5.8 m
  • Collector length 12 m
  • INDITEP Pilot Plant PSA Direct Steam Production
  • INDITEP Pilot Plant PSA Direct Steam Production

Project location

Similar Projects

Schwabstraße 43
70197 Stuttgart

+49 711 64871-0
info@sbp.de