• Neubau SCHARRena
    © swen carlin 2011
Projects

New construction of SCHARRena

Stuttgart, Germany, 2011

Within two years the Mercedes-Benz Arena was retrofitted into a soccer stadium with an integrated gymnasium. The unsupported gymnasium was overbuilt with two upper levels of the stand and integrated in the Untertürkheimer-curve. 2,35 m high pre-stressed concrete trusses reach a length of 38 m. Inside, the pre-stressed concrete trusses are mounted indirectly at a cross girder. In this way the support reactions are spread in crosswise direction along the transversal stanchions which are off the axis of the pre-stressed concrete trusses. At the outside the support is situated on the curved reinforced concrete external wall.


  • Location

    Stuttgart, Germany

  • Architect

    asp architekten Stuttgart

  • Client

    Stadion Neckarpark GmbH & Co.KG

  • Our Scope of Work

    conceptual design, construction design, technical spots check

  • GFA (level 0 and 1) 10,380 m²
  • Height 11,5m
  • Seats 2,000
  • Length x width 76 m x 38 m
  • Gross cubic capacity 67,480 m³
  • Neubau SCHARRena © swen carlin 2011

Project location

Similar Projects

Schwabstraße 43
70197 Stuttgart

+49 711 64871-0
info@sbp.de