• Tramhaltestelle Hauptbahnhof Berlin
    © Hans Joosten
Projects

Tram Stop at Berlin Main Train Station

Berlin, Germany, 2015

A new and important transport transfer station between East and West Berlin, the new tram stop north of the Berlin Main Train Station is a modern and resource efficient urban project. Long, curved reinforced concrete shells cover the two platforms that rest on upward extended longitudinal walls of the connecting underground stairwells. Slender steel columns further support the roof completely unobtrusive to the platforms. The curvature of the roofs is of engineering significance, allowing for the shell bearing behaviour with minimised bending movements. The light-colored monolithic exposed concrete of the roof floats above the anthracite-coloured floor from concrete large format panels. In defiance of its dynamic form, the consistent use of only one material creates a pure and simple design.


  • Location

    Berlin, Germany

  • Architect

    Gruber + Popp Architekten, Berlin

  • Awards

    Ulrich Finsterwalder Ingenieurbaupreis 2017, Auszeichnung

  • Client

    Berliner Verkehrsbetriebe (BVG)

  • Contractor

    ARGE Matthäi + Glass

  • Our Scope of Work

    conceptual design, construction design, technical spots check

  • Roof surface 700 m²
  • Roof width 6 m each
  • Concrete thickness in the peripheral areas only 7 cm
  • Roof length 58 m
  • Height from lower edge of the roof max. approx. 4.90 m
  • Tramhaltestelle Hauptbahnhof Berlin © Manuel Euer
  • Tramhaltestelle Hauptbahnhof Berlin © Hans Joosten

Project location

Similar Projects

Schwabstraße 43
70197 Stuttgart

+49 711 64871-0
info@sbp.de