Stuttgart, Germany, 2018

The accounting firm Ernst & Young located its headquarters in the new Airport City in Stuttgart. The building will provide space for offices, conference and lecture halls, a staff restaurant, library, archives and underground parking. The building is composed of three elements with curved floor plans. The fundamental structure is a flat roof with support columns. Wherever the columns are not continuous, they are supported by girders, some of which are pre-stressed. The façade elements span one floor and are attached to the edge of each floor slab, as is a wide steel-glass awning over the entrance area. As the building is constructed without expansion joints, special consideration must be given to the constraining forces. The basement floors go below groundwater level, requiring a waterproof construction. The foundation is partially supported by drilled piles.
The construction of the building was completed in February 2016. In addition there was also a membrane roof built in one of the courtyards. We were also responsible for the check engineering of the roof. Its construction was completed in May 2018.


  • Location

    Stuttgart, Germany

  • Architect

    Hascher Jehle Architektur, Berlin (Entwurf); BKF Architekten, Stuttgart (Ausführung)

  • Client

    Flughafen Stuttgart GmbH

  • Structural engineer

    igg Konstruktive Werte, Stuttgart

  • Contractor

    Züblin

  • Our Scope of Work

    check engineering of structural stability, fire safety and sound insulation; site supervision

  • Gross cubic capacity 247,000 m³
  • Gross floor area 40,000 m² above ground,
    20,000 m² under ground
  • Height max. 30 m
  • Thickness of floor slabs 35 cm
  • Length x width 130 m x max. 100 m
  • Floors 6 above ground,
    2 under ground
  • Column spacing max. 8 m
  • New Office Airport Stuttgart (NOAS) Ernst & Young - Prüfung © Oliver Rieger
  • New Office Airport Stuttgart (NOAS) Ernst & Young - Prüfung © Oliver Rieger

Project location

Similar Projects

Schwabstraße 43
70197 Stuttgart

+49 711 64871-0
info@sbp.de