• Voith Training Center
Projects

Voith Training Center Heidenheim

Heidenheim, Germany, 2014

In Heidenheim the company Voith built a new training center for apprenticeship. The aim of the design was to obtain a large, transparent and largely column-free workshop area on the ground floor as well as offices and class rooms on two upper floors.
The vertical loads are partially carried by a reinforced concrete core. Four main columns transfer further vertical loads from the roof to the foundation. A steel grid of main girders spans the main columns, thus connecting the columns with the core like a clasp. The grid system supports a main part of the roof and, in addition, carries the vertical loads of the upper floors with hangers (tension system). A glazed mulliontransom façade with supporting columns runs around the building.


  • Location

    Heidenheim, Germany

  • Architect

    Eberhard Faecke

  • Cooperation

    Transsolar

  • Client

    Voith AG

  • Contractor

    Ed. Züblin AG

  • Our Scope of Work

    conceptual design, detailed design

  • GFA approx. 7,788 m²
  • Dimensions approx. 63 m x 43 m x 17 m,
    with one-storey cellar in core zone
  • Voith Training Center
  • Voith Training Center

Project location

Similar Projects

Schwabstraße 43
70197 Stuttgart

+49 711 64871-0
info@sbp.de